At the Moa Point Treatment Plant, wastewater travels through a series of screens, tanks, bioreactors, clarifiers and ultraviolet treatments before being discharged as liquid into Cook Strait.The plant has capacity to discharge up to 260,000 cubic metres of wastewater per day.
Each day the plant cleans and disinfects wastewater from about 180,000 people. It treats an average 850 litres of water (or about three standard bathtubs) every second and up to 3,000 litres a second during heavy rainfall.
Resource consents
WGN080003 [26182] Land Occupation by Outfall Pipe (Moa Point WWTP)
WGN080003 [26183] Contaminants Discharge to Air WWTP (Moa Point WWTP)
WGN080003 [31505] Discharge of Treated Wastewater to Coastal Marine Area (Moa Point WWTP)
WGN080003 [35047] Discharge of Partially Treated Wastewater to Coastal Marine Area (Moa Point WWTP)
WGN960094 [1471] Contaminants Discharge to Air IPS (Moa Point WWTP)
Resource consent reports
Annual Reports:
Moa Point Wastewater Treatment Plant Annual Resource Consents Report 2024-2025
Carey's Gully Southern Landfill Annual Resource Consents Report 2024-2025
Moa Point Wastewater Treatment Plant Annual Resource Consents Report 2023-2024
Moa Point Wastewater Treatment Plant Annual Resource Consents Report 2022-2023
Moa Point Wastewater Treatment Plant, GWRC Compliance Monitoring Report 2022 - 2023
Careys Gully Southern Landfill Annual Resource Consents Report 2021/2022
Moa Point Wastewater Treatment Plant Annual Resource Consents Report 2021/2022
Moa Point Wastewater Treatment Plant Annual Resource Consents 2020/2021
Moa Point Wastewater Treatment Plant Annual Resource Consents 2019/2020
Quarterly Reports
Moa Point Wastewater Treatment - January - March 2025 - Quarterly Resource Consents Report
Moa point Wastewater Treatment Plant October - December 2024 - Quarterly Resource Consents Report
Moa Point Wastewater Treatment Plant July - September 2024 - Quarterly Resource Consents Report
Moa Point Wastewater Treatment Plant January March 2023 Quarterly Resource Consents Report
Consent Compliance Reports
Moa Point Wastewater Treatment Plant - Compliance Monitoring Report 2023 - 2024
Moa Point Wastewater Treatment Plant - Compliance Monitoring Report 2022 - 2023
Moa Point Wastewater Treatment Plant - Compliance Monitoring Report 2021 2022
Appendices
Appendix IV - Moa Point Outfall CCE Inspection report 2025.pdf
Appendix IV - Moa Point Outfall Diving Inspection report 2025.pdf
Appendix V - Moa Pt Ambient Microbe Monitoring August 2024 Issue.pdf
Appendix V - Moa Pt Ambient Microbe Monitoring February 2025 Issue.pdf
Appendix VI - Moa Pt WWTP Smoke Test November 2024 Issue.pdf
Appendix VII - Moa Point Bypass Flow sample results Cond.16 2024/25.pdf
Appendix VIII - Moa Point Shoreline sampling post discharge Cond.10 2024/25.pdf
Appendices - Moa Point Wastewater Treatment Plant Annual Resource Consent Report 2023/2024 -
Plant performance
Current Status: Non-compliant (with noted issue)
Period: August 2025
Commentary​
The plant is compliant for effluent quality, but was non-compliant for one air quality measure.
Discharges
No discharges in August.
Odour complaints
There was one odour complaint in August relating to the Southern Landfill site and Careys Gully Sludge Dewatering
plant.
Items of significance:
Odour Management System
Investigations continue into the decreased performance of the chemical scrubber system. The plant was non-compliant for Total Reduced Sulphur (TRS) in August and investigations continue. The team are actively working with overseas odour experts to help identify the root cause of the issue. Previously reported adjustments to operational set points of the scrubber system have not acheived desired performance outcomes, and the next set of actions to restore reliable performance are being implemented.
Read the full August 2025 Moa Point wastewater treatment plant monthly performance report