Severe weather conditions from Wednesday 30 April to Friday 2 May may impact the network
Severe weather conditions may impact the network

Due to severe weather conditions forecasted from today, 30 April until Friday 2 May, there may be impacts on the network, 

Heavy rain increases the chance of excess stormwater entering the wastewater network, which it doesn’t have capacity for. This means there is a higher risk of wastewater overflows during wet weather events or emergencies such as major power cuts.

Our operations team are checking known risk areas and working to ensure that the stormwater network will be running as smoothly as possible. 

 

Projects / Nathan Street Pipe Bridge Replacement

Nathan Street Pipe Bridge Replacement

Overview

On behalf of Wellington City Council, Wellington Water are replacing a damaged potable water and wastewater pipe bridge to improve outcomes for the community and environment.

Start Date
5/05/2025
End Date
13/06/2025
Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400