Untreated, unscreened wastewater has been discharged into Tarakena Bay. Check LAWA.org.nz before visiting beaches.
Untreated, unscreened wastewater has been discharged into Tarakena Bay. Check LAWA.org.nz before visiting beaches.

The short outfall is discharged untreated, unscreened wastewater into Tarakena Bay between 11.38 am and 12.44 pm on 7 June. 

Check LAWA.org.nz before visiting beaches along the south coast. Public Health information is available here.

Projects / Nathan Street Pipe Bridge Replacement

Nathan Street Pipe Bridge Replacement

Overview
All Updates

On behalf of Wellington City Council, Wellington Water are replacing a damaged potable water and wastewater pipe bridge to improve outcomes for the community and environment.

Start Date
5/05/2025
End Date
30/11/2025
Contact:

If you have any questions about this work, please contact:

Wellington Water, 04 912 4400

Latest Updates

22 December 2025 Protecting Wellington's waterways

All Updates

22 December 2025 Protecting Wellington's waterways