Nathan Street Pipe Bridge Replacement
Updated May 1, 2025
Searched everything and got 2381 results
Updated May 1, 2025
Updated November 26, 2024
Wellington region’s wastewater system is ageing, and parts of the network are over 120 years. When the wastewater network was originally constructed, it was designed around protecting public health… Read more
Updated November 28, 2022
Paremata Emergency Management Team. Sheena O'Brien, second from right.
The morning was cold, 22mm of rain had already fallen when Sheena O’Brien got the call that no one expected to receive.
A…
Read more
Updated February 12, 2024
Updated November 2, 2022
The new fluoride facilities at the Te Mārua and Gear Island Water Treatment Plants are now operating and reliably fluoridating the drinking water within the Ministry of Health target range.
“The…
Read more
Updated November 8, 2022
Wellington Water is back at work on Knights Road, Lower Hutt. A 1.5 kilometre pipeline is being installed from Waterloo to the Hutt River, to ensure a new ultraviolet treatment system will be good to… Read more
Updated March 10, 2023
Wellington Water wants to hear from the Lower Hutt community on a proposal to build a new reservoir next to the existing Naenae Reservoir.
The proposed new reservoir would be able to store 15…
Read more
Updated March 28, 2023
Construction is about to begin on a wastewater storage tank in Porirua which will reduce discharges to Te Awarua-o-Porirua Harbour.
The new storage tank will temporarily store wastewater and…
Read more
Updated March 27, 2023
Construction is about to begin on a wastewater storage tank in Porirua which will reduce discharges to Te Awarua-o-Porirua Harbour.
The new storage tank will temporarily store wastewater and…
Read more
Updated November 9, 2022
We are working continually to improve Wellington’s water, wastewater and stormwater networks, to ensure they provide enough capacity, protect the environment from contamination, and are more… Read more